Description
The sites are accessable from the Ballylinney Road. Just at the bridge at number 14/16. The sites are areplacement for the property known as ‘Rose Cottage’.
The 3 sites are accessed from the tarmac laneway (which is owned by the vendor) and will transfer to the newpurchaser.
Each site is approx 1/4 of an acre
Identification plans are enclosed for perusal .
Mains water and electricity are available on site.
ENTRANCE PORCH
ENTRANCE HALL: Storage cupboard and recessed ceilign lighting.
GAMES ROOM: 15’1” x 17’5” / 4.61m x 5.31m. Laminated flooring. Double radiator. Pine panel door. UPVC double glazed window.
CLOAKROOM / SHOWER ROOM: Low flush WC. PEDESTAL WASH HAND BASIN. Walk-in fully tiled double shower unit. Built-in storage cupboard. Pine panel door.
BEDROOM 1: 11’5” x 10’1” / 3.49m x 3.06m. Solid oak flooring. Double radiator. Pine panel door.
DINING ROOM: 12’0” x 8’2” / 3.64m x 2.62m. Light oak solid flooring. Dimmer switch. Cornice. Single radiator. UPVC double glazed window.
SUN LOUNGE: 9’1” X 8’1” / 2.78m X 2.49m. Double french doors to rear and decking area. Ceramic tiled floor. Double radiator. UPVC double glazed window and back door.
LOUNGE: 15’1” x 14’4” / 4.62m x 4.38m. Brick fireplace with log burning fire. Solid pine flooring. Beamed ceiling.
L SHAPED KITCHEN / BREAKFAST AREA: 22’1” X 12’0” Excellent range of maple floor and eye level units. Part tiled walls. Ceramic tiled flooring. Single drainer stainless steel sink unit with mixer taps. Double radiator. UPVC double glazed window.
FAMILY ROOM: 14’6” X 11’0” / 4.42m x 3.34m. Brick fireplace. Light oak flooring. Beamed ceiling. Double radiator. UPVC double glazed window.
REAR HALL: 11’1” x 14’4” / 3.40m x 4.42m. Boiler house with oil fired boiler.
UTILITY ROOM: Plumbed for washing machine.
FIRST FLOOR
BEDROOM 2: 12’0” x 8’0” / 3.65m x 2.49m.
BEDROOM 3: 8’5” x 8’2” / 2.63m x 2.54m.
BEDROOM 4: 11’0” x 8’0” / 3.40m x 2.49m.
BATHROOM: White suite corner bath. Low flush WC. Pedestal wash hand basin with cor-ner shower unit.
The property and shed could be retained while building, but would need to be demolished on completion.